MIA VT Work Underway During Holiday Travel Rush

image courtesy of MIA

Travelers navigating Miami International Airport (MIA) during the holiday travel rush are finding vertical-transportation (VT) equipment out of service, Bollyinside reports. Fifty elevators, escalators and moving walkways are currently undergoing upgrades or total replacements as part of a five-year contract won by Schindler in July 2023. MIA’s 10-year renovation plan includes 372 pieces of VT equipment, with an average of 30 to 40 units undergoing work each year. Elevators are a priority in the renovation efforts, addressing ADA compliance issues.

Get more of Elevator World. Sign up for our free e-newsletter.

Please enter a valid email address.
Something went wrong. Please check your entries and try again.

Canopy over the escalator at the Embarcadero station; image courtesy of BART

BART’s Top 24 Accomplishments of 2024 Include Escalator Updates

Pankrác metro station platform; photo by A. Savin for Wikipedia

Year-Long Construction Closes Two Prague Metro Stations

The station is served by Schindler escalators; photo by Marc A. Hermann for the NYC Metropolitan Transportation Authority (MTA).

NYC LIRR Among “Most Beautiful for Interior Design”

At the Royal Palace of Naples, an interactive virtual elevator transports you through four centuries of life in the palace; image via Finestre sull’ Arte.

Royal Palace of Naples Introduces Interactive Virtual Elevator Exhibit

DLF The Arbour; image courtesy of DLF

65 Otis Elevators for Luxury Residential Development in Gurugram, India

ALIMAK INVESTS IN ROBOTICS TECHNOLOGY FOR BUILDING MAINTENANCE

Alimak Invests in Robotics Technology for Building Maintenance

image by Clker-Free-Vector-Images for Pixabay

Three Stuck in Elevator Shaft in Seattle Rescued

image by OleksandrPidvalnyi for Pixabay

Closings for Christmas