Elevator Shafts for New WDW Vacation Property Take Shape

Rendering of the DVC at Disney’s Polynesian Village; image courtesy of dvcfan.com

Vertical construction of the new Disney Vacation Club (DVC) wing at Disney’s Polynesian Village Resort at the Walt Disney World (WDW) Resort in Orlando, Florida, continues with elevator shafts taking shape, WDW News Today reports. The building’s foundation has been carved out closer to the beach. Short walls of wood and concrete have been constructed within the foundation along with concrete walls that appear to currently be three stories tall, creating elevator shafts with rectangular openings that will be the doorway for each floor. Concept art shows that the building will be taller when completed. The site of the new DVC building sits on the former Luau Cove, which was home to the Spirit of Aloha dinner show that closed in 2020. Projected to open in late 2024, the new property is expected to complement the existing resort and evoke the spirit of the Pacific Islands. Disney’s Polynesian Resort underwent an extensive refurbishment recently. Alongside the Magic Kingdom, Disney’s Polynesian Village Resort turned 50 in 2021. The resort opened on October 1, 1971, with Disney’s Contemporary Resort.

Get more of Elevator World. Sign up for our free e-newsletter.

Please enter a valid email address.
Something went wrong. Please check your entries and try again.

Rendering of the outdoor elevator; image via The Japan News

Japan Castle To Get Outdoor Elevator

Inside the Chhatrapati Shivaji Maharaj International Airport; photo by Robert Polidori for SOM

Lack of Adequate VT Sparks Concern in Mumbai, India

The Alpha Matar team; image courtesy of Alpha Matar

Alpha Matar Signs Cooperation Protocol With Sunrise Hotels Group

Images courtesy of KONE

KONE Celebrates 115th Anniversary

SDSU PARKING ELEVATORS OPERATING WITH EXPIRED PERMITS

SDSU Parking Elevators Operating With Expired Permits

Grone

NEII Congratulates Grone on Retirement

SCHINDLER REFLECTS ON 2025 CHALLENGES, REWARDS

Schindler Reflects on 2025 Challenges, Rewards

Techno International Airport; image courtesy of Otis

Otis Provides 118 Units for New Cambodia Airport