Carl Ekman House

Carl-Ekman-House

Modernisation of residential building in two phases

submitted by Apex Lifts

Apex Lifts are pleased to have been appointed lead contractor for the modernisation of two passenger lifts at Carl Ekman House. Holding a long-term lift servicing and maintenance partnership with Gravesham Borough Council across their residential sites, Apex Lifts strived to oversee the modernisation project duration with minimal disturbance to residents and end-users.

Carl Ekman House is a 14-storey, high-rise residential building located in Northfleet, Gravesend. Lift modernisation works were carried out to improve reliability within two phases. This ensured one lift remained fully operational for building occupants throughout the project duration.

Managing Director: Warren Jenchner
Construction Director: Gary Poynter
Project Manager: Gary Ager
Construction Sales Consultant: Tom Hambrook
Lead Engineer: Lee Policelli

Scope of Works

  • Removal of the pre-existing, redundant lift equipment.
  • Complete design, supply, installation, testing and commissioning of a bespoke Apex lift and accompanying equipment.
  • Installation of vandal resistant door panels and Disability Discrimination Act (DDA)-compliant components as per specification.
  • Provision of an in-house Resident Liaison Officer (RLO) who provided continuous communication with relevant Gravesham Borough Council staff.
  • Coordination of multiple separate deliveries for bulk items to ensure ease of access and minimal disturbance to residents within the fully occupied building.
  • Supply of Thames Valley Controls “CMS Anywhere,” remote lift monitoring system allowing for real-time feedback and data on each lift’s performance.
  • Provision of a 12-month comprehensive lift servicing, maintenance and reactive repair warranty.
submitted by Apex Lifts

submitted by Apex Lifts

Get more of Elevator World. Sign up for our free e-newsletter.

Please enter a valid email address.
Something went wrong. Please check your entries and try again.

Elevator World UK | 2nd Quarter 2022 Cover

Transporting London

Transporting London

The Digital Switch Is Happening

The Digital Switch Is Happening

A Love for Lifts

A Love for Lifts

Construction of Poincare Space Map and Phase Plan Map for Escalators, Part 2

Construction of Poincare Space Map and Phase Plan Map for Escalators, Part 2

The clean, modern appearance of the Motala 2000 platform lift blends flawlessly with the contemporary design of this store.

The Manufacturer-Distributor Relationship

Rated Load and Maximum Available Car Area

Rated Load and Maximum Available Car Area

Terry Lifts Named “Made in Britain” Member

Terry Lifts Named “Made in Britain” Member

Key Escalator Events and Some Issues

Key Escalator Events and Some Issues

Elevator World UK | 2nd Quarter 2022 Cover