KONE to Install Elevators at Palais Royale

KONE-to-Install-Elevators-at-Palais-Royale

KONE India is to provide vertical-transportation solutions for this project, currently under construction in Mumbai.

KONE India has received an order to install 10 elevators in Palais Royale, slated to be among the tallest buildings in the country at 300 meters high. Under construction in Mumbai at Worli, the tower is a modern residential building and is one of India’s first precertified Leadership in Energy and Environmental Design® Platinum-rated green residential buildings. KONE will provide six MiniSpace™ elevators that will travel at speeds of up to 7 mps, which are among the fastest in the country, and another four MiniSpace elevators traveling at 3.5 mps.

The building is also setting benchmarks for quality, design, environmental aesthetics, water conservation, energy efficiency, waste management, safety and security, urban planning, technology and overall building management.

Vikas Kasliwal, vice chairman and CEO, Shree Ram Urban Infrastructure, Ltd., said:

“Palais Royale represents the futuristic image of the Mumbai city. We have opted only for [high] global technology solutions for the building. We chose KONE MiniSpace elevators, as we believe [they] will provide fast, smooth, safe and comfortable vertical transportation to residents.”

Since 1953, Elevator World, Inc. has been the premier publisher for the global vertical transportation industry. It employs specialists in Mobile, Alabama, and has technical and news correspondents around the world.

Get more of Elevator World. Sign up for our free e-newsletter.

Please enter a valid email address.
Something went wrong. Please check your entries and try again.

Elevator World | July 2011 Cover

Proposal-and-Specifications-for-a-Titan-Plunger-Elevator

Proposal and Specifications for a Titan Plunger Elevator

Longtime-EW-Board-Member-Retires

Longtime EW Board Member Retires

Elevator-World---Fallback-Image

Significant Inventions

The-Ritz-Carlton-Hotel-&-Residences

The Ritz-Carlton Hotel and Residence and JW Marriott at LA Live

Eatons-PM3-Module

Eaton’s PM3 Module

Rope-Dynamics-Figure-6

Rope Dynamics

2011-ECA-Annual-Meeting

2011 ECA Annual Meeting

John-Griffith-Sr

John Griffith, Sr.

Elevator World | July 2011 Cover