73-Story 1000M With Otis Elevators Tops Out in Chicago

1000M tops out; photo courtesy of McHugh Construction.

The final floor of concrete has been poured for the 73-story 1000M in Chicago’s South Loop, with McHugh Construction serving as general contractor, Urbanize Chicago reports. McHugh Senior Project Manager David Steffenhagen tells ELEVATOR WORLD the 738-apartment tower, the last designed by the late Helmet Jahn, will be served by an Otis elevator system. Boasting views of the Loop and Lake Michigan overlooking Grant Park, 1000M is being developed by Time Equities, JK Equities and Oak Capitals with “a highly sculpted form with an angled, cantilevered base topped by glass-clad residential floors that widen as the building rises.” A property showroom is set to open this fall ahead of anticipated completion in summer 2024.

Get more of Elevator World. Sign up for our free e-newsletter.

Please enter a valid email address.
Something went wrong. Please check your entries and try again.

Elevator entrance; image courtesy of NYC Housing Connect via New York YIMBY

Skyline Elevator System For New Brooklyn Residential Building

David M. Childs; headshot via the Architect's Newspaper

In Memoriam: David M. Childs

Image courtesy of Stannah Lifts

Stannah Urges Lift Owners To Prepare for PSTN Switchover

Ziehl-Abegg-Logo

Ziehl-Abegg Reports Bright Outlook for 2025

SIMS4LIFTS NOW SIMSINLIFTS, LAUNCHES ENHANCED PORTAL

Sims4Lifts Now SIMSINLIFTS, Launches Enhanced Portal

New Elevator at the Brentwood Town Centre SkyTrain station; image courtesy of TransLink

SkyTrain Station in Vancouver Receives Major Expansion

MACAU GOVERNMENT URGING ANNUAL ELEVATOR INSPECTIONS

Macau Government Urging Annual Elevator Inspections

Wonder Wheel at Coney Island; photo by DangApricot for Wikipedia

DOB Elevator Unit Inspects Coney Island Amusement Park