Schindler Providing 150 VT Units to Latest Phase of Mecca Giga-Project

Schindler equipment will transport people and goods from street level retail to hotels above; image courtesy of masardestination.com.

Schindler will provide 150 vertical-transportation (VT) units, including 44 Schindler 7000 elevators, 65 Schindler 5500 elevators, 36 Schindler 9300 escalators and five platform lifts to Masar, a mixed-use “giga-project” in Mecca, Saudi Arabia. When Schindler announced the contract on July 11, the OEM observed it is building on its partnership with Umm Al Qura Development & Construction Co., the outfit behind the 1.2 million-m2, mixed-use development. Schindler equipment will transport people and goods through the shops and restaurants at street level to hotels above. The Schindler R.I.S.E robotic installation system, making its debut in Saudi Arabia, will be used to install all of the Schindler 7000 elevators. “R.I.S.E can autonomously operate around the clock, drilling and setting anchor bolts and improving the quality and speed of construction, as well as on-site safety,” Schindler observed.

Get more of Elevator World. Sign up for our free e-newsletter.

Please enter a valid email address.
Something went wrong. Please check your entries and try again.

Wen

KONE Appoints Wen As EVP Procurement and Board Member

Husband

Husband Appointed Incoming CECA Supplier Director

Panoramic MRL elevators serve the new CKG terminal; image courtesy of TKE.

TKE Supplies 102 VT Units For New CKG Terminal in China

(l-r) John Stopes, Johannes de Jong and Michiel de Moel at the signing ceremony

Elevating Studio and The VT Studio Join Forces

Sobha Central; image courtesy of Sobha Realty

Sobha Realty Launches Major New Dubai Development

Alvarado

Bill Requiring Elevator Repairs Dies in Texas Legislature

TÜRKIYE’S AYSAD HOLDS 54TH ORDINARY GENERAL ASSEMBLY

Türkiye’s AYSAD Holds 54th Ordinary General Assembly

Elevator Service Inc. logo

ESI Acquires Oklahoma-Based American Elevator