Putting the Garage in the Sky

Putting-the-Garage-in-the-Sky-06-2018-
Construction on the 60-story tower was completed in January 2017. This view is looking upward under the unique car elevators; photo courtesy of Porsche Design Tower.

ELEVATOR WORLD first reported on the Porsche Design Tower in Sunny Isles Beach, Miami, in our September 2015 issue. The first-of-their-kind car lifts were installed under the ASME A17.7 performance-based code by Mid-American Elevator Co. of Chicago. Dubbed “Dezervators” after Gil Dezer of Dezer Development, which built the tower, they include patented technology that allows the driver to stay inside a vehicle while riding the elevator. It takes only 75 s. to get to any apartment in the tower. The high-rise parking spaces are called “sky garages” and located either adjacent to a living space or one story below the home accessible via an internal staircase, CNN reported.

Since 1953, Elevator World, Inc. has been the premier publisher for the global vertical transportation industry. It employs specialists in Mobile, Alabama, and has technical and news correspondents around the world.

Get more of Elevator World. Sign up for our free e-newsletter.

Please enter a valid email address.
Something went wrong. Please check your entries and try again.
Countrywide-growth-seen-for-VT-while-construction-remains-focused-on-Dubai-06-2018-

Countrywide growth seen for VT, while construction remains focused on Dubai.

Where-No-Man-or-Elevator-Cab-Has-Gone-Before-06-2018-Figure-1

Where No Man (or Elevator Cab) Has Gone Before

New-facility-on-the-way-test-tower-opens-designs-released-and-opportunities-arise-06-2018-

New facility on the way, test tower opens, designs released, and opportunities arise.

The-People-Issue-06-2018

The People Issue

How-Biodegradable-Oils-Function-in-Hydraulic-Environments-06-2018-

How Biodegradable Oils Function in Hydraulic Environments

Triangular-Residential-Tower-Planned-in-Rotterdam-06-2018-

Triangular Residential Tower Planned in Rotterdam

Elevator-Cab-Decoration-Planning-Issues-06-2018-

Elevator Cab Decoration Planning Issues

Digitalization-and-Lift-Doors-06-2018-

Digitalization and Lift Doors