Contract Matters

Entitlement to Liquidated Damages Lost After Alleged Verbal Agreement

Assessing the importance of documenting phone calls related to business In the case of Mansion Place Limited v. Fox Industrial Services Ltd. [2021], the Technology and Construction Court (TCC) considered...

Terms & Conditions: Formation, Incorporation and Validity

Terms & Conditions: Formation, Incorporation and Validity Transparent negotiations and particularly onerous terms by Thomas Salter In Blu-Sky Solutions Ltd. v. Be Caring Ltd. [2021], the Commercial Court considered contract...

Excluding Liability for Deliberate Breach

Is special wording required? In the recent case of Mott Macdonald Ltd. v. Trant Engineering Ltd., the Technology and Construction Court (TCC) considered whether an exclusion clause required exceptional wording...

Contract Interpretation and Repudiatory Breach

In the recent case of Optimus Build Ltd. v. Southall & McManus, the Technology and Construction Court (TCC) considered a dispute in which the contractor believed the contract was a...

Letters of Intent and Incorporation  of Standard Form Contracts

In the case of OD Developments v Oak Dry Lining Ltd, the TCC considered the operation and effect of a letter of intent (“LOI”) in the context of whether a...

The residential delivery robot; image courtesy of Hyundai Engineering

Hyundai Launches Residential Delivery Robots in South Korea

The Pinnacle One Yonge jobsite; image courtesy of PERI Canada

PERI Describes Innovative Formwork for Canada’s Tallest Residential Tower

THREE-YEAR-OLD BOY DIES FROM FALLING FROM ESCALATOR HANDRAIL

Three-Year-Old Boy Dies Falling From Escalator Handrail

Lift Comm by TEC is proud of its role in making the 14 St Station Complex fully accessible; image courtesy of Lift Comm.

TEC Subsidiary Lift Comm Continues MTA Accessibility Collaboration

Mareterra; photo © Hufton+Crow for Mareterra

Monaco Sustainable Development With Maspero Lifts Competes