Marshall Student Center To Replace Elevators by End of 2025

Image courtesy of Oracle Photo/Julia Saad

Marshall University will replace the elevators at the Marshall Student Center (MSC) by December 2025, The Oracle reports. The announcement comes as one of the elevators was completely shut off after the motor “blew up,” according to MSC Director Matthew Marshall. There are four elevators at the MSC; three are passenger elevators, and one is a service elevator used by staff only. The first two elevators will be replaced in the fall, followed by the service elevator in summer 2025. The fourth elevator will be replaced during fall 2025. Funds for the new equipment will come from the MSC’s budget and reserves.

Get more of Elevator World. Sign up for our free e-newsletter.

Please enter a valid email address.
Something went wrong. Please check your entries and try again.

The residential delivery robot; image courtesy of Hyundai Engineering

Hyundai Launches Residential Delivery Robots in South Korea

The Pinnacle One Yonge jobsite; image courtesy of PERI Canada

PERI Describes Innovative Formwork for Canada’s Tallest Residential Tower

THREE-YEAR-OLD BOY DIES FROM FALLING FROM ESCALATOR HANDRAIL

Three-Year-Old Boy Dies Falling From Escalator Handrail

Lift Comm by TEC is proud of its role in making the 14 St Station Complex fully accessible; image courtesy of Lift Comm.

TEC Subsidiary Lift Comm Continues MTA Accessibility Collaboration

Mareterra; photo © Hufton+Crow for Mareterra

Monaco Sustainable Development With Maspero Lifts Competes

ATLAS ELEVATORS SIGNS CONTRACT WITH FUJIHD

Atlas Elevators Signs Contract With FUJIHD

Budden

In Memoriam: Darren Budden

image courtesy of Nibav Lifts

Nibav Lifts Introduces New Residential Elevators in U.S.