Multi-Tower Plans Revealed for Manchester Site

Proposed Manchester, U.K., office block; image courtesy of Studio Egret West

Developer Oval Real Estate has unveiled plans for the transformation of Albert Bridge House in Manchester, U.K, North West Place reports. The 18-store brutalist Albert Bridge House will be demolished, and a 45-story skyscraper featuring 367 homes and a distinctive 350,000 ft2 office block with 19 stories will take its place. Oval’s proposed development is designed by architect Studio Egret West. In addition to the residential tower and the office block, the proposals include more than 1.2 acres of outdoor amenity space. Both buildings would also have retail and commercial space on their ground floor. Both buildings would have sustainable features, and the office block is aiming to be net zero with natural ventilation, solar panels and air source heat pumping. Oval’s plans are due to be lodged with Manchester City Council later this year. The project team for Oval’s plans includes Urban Green, Avison Young, Curtins, Turley, Hoare Lea, Cumming, Hilson Moran, Deloitte, Urban Change and Counter Context. More information about the plans on the consultation website: albertbridgehouse-mcr.com. The consultation concludes on October 9.

Get more of Elevator World. Sign up for our free e-newsletter.

Please enter a valid email address.
Something went wrong. Please check your entries and try again.

Cooper

Cooper Announced as CIBSE President Elect for 2025/26

Internal structure of the elevator smart maintenance system; image courtesy of N2 Infotech

N2 Infotech Launches AI Predictive-Maintenance Solution

image courtesy of Stannah

Stannah to Support STEM Program at NMRN

TenBerke Architects designed the proposed supertall; image via New York YIMBY.

Construction Plans and Rendering of Brooklyn Tower Revealed

image by Thomas_C_Rosenthal for Pixabay

Company Chosen to Repair Elevators in Odesa

UCLA DELAYS ELEVATOR INSPECTIONS

UCLA Delays Elevator Inspections

The addition contrasts with the original structure resembling stacked boxes and completed in 2007; image by OMA via Instagram.

TEI Involved in Elevators for New Museum Addition in NYC

Solberg

Clarkson + Varick Welcomes Director of Operations