Otis Providing 127 VT Units for Panama Metro Line 3

Otis 515NPE escalators will serve Line 3 of the Panama Metro; photo courtesy of Otis.

Building on a more than 10-year relationship, Otis has been awarded a contract to supply 127 vertical-transportation (VT) units — including more than 40 Gen2® elevators and 85 515NPE escalators — to Panama Metro Line 3. Replacing conventional steel cables with polyurethane-coated flat belts, Gen2 eliminates the need for a separate machine room and features energy-efficient ReGenTM drives. Designed to serve large transportation hubs, 515NPE escalators are equipped with a frequency inverter that allows them to adapt to varying passenger flow. In 2012, Otis was tapped to design, manufacture, supply, install, test, commission and maintain Line 1’s 40 elevators and 130 escalators. In 2016, the OEM was chosen to supply 65 elevators and 132 escalators, along with three elevators and six escalators serving an extension, for Line 2. Line 3 spans 34 km.

Get more of Elevator World. Sign up for our free e-newsletter.

Please enter a valid email address.
Something went wrong. Please check your entries and try again.

Çankaya station of the İzmir Metro; photo by A. Savin for Wikipedia

Overhaul of 278 Pieces of VT Nearly Complete in İzmir

The golf outing will take place at Hunter’s Green Country Club; image courtesy of Hunter’s Green Country Club.

EW Presents Inaugural Golf Outing in Tampa

Aveni

In Memoriam: Thomas Lawrence Aveni

TAISEI SQUARE HANOI; image © Taisei Square Hanoi

Fujitec Delivers Vietnam’s First 240 M/Min Elevators

Elevator-World---Fallback-Image

Toromont Industries Proposes Massive 17-Building Project in Vaughan

Elevator-World---Fallback-Image

Sims4Lifts Named Finalist for UK Business Awards

Image courtesy of Diligent Robotics

Autonomous Robot Completes 110,000-Plus Elevator Rides

Image courtesy of MP Lifts

MP Lifts Hosts MP Open Days For U.K. And Ireland Professionals